Sahyadri Agro
Pipe Industries

Type:

Roof-top metal sheet

Plant Capacity:

807 kWp

Technology Used:

Monocrystalline Modules with
String Inverters

Roof Orientation:

South

Annual Power Generation:

1,031,468 - 1,327,658 kWh/year

Expected Lifetime Generation:

25,786,700 - 33,191,450 kWh

Sustainability Impact:

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

Challenge

As the consumer manufactures HDPE pipes, the factory operates continuously. Any power failure during installation or operation could result in significant production losses and increased wastage, posing a critical challenge.

Solution

To ensure uninterrupted operations, the project team planned to take only one carefully scheduled shutdown during the grid connectivity process. This minimized disruptions, maintained operational efficiency, and prevented production losses.

Call Us

+91 88888 35719

+91 70837 33418

info@aaraenergy.com

Call Us

+91 70837 33418

sales@aaraenergy.com

Call Us

+91 70837 33418

+91 96738 46967

info@aaraenergy.com

SAHYADRI AGRO PIPE INDUSTRIES

Type:

Roof-top metal sheet

Plant Capacity:

807 kWp

Technology Used:

Monocrystalline Modules with
String Inverters

Roof Orientation:

South

Annual Power Generation:

1,031,468 – 1,327,658 kWh/year

Expected Lifetime Generation:

25,786,700 – 33,191,450 kWh

Sustainability Impact: This project is expected to reduce carbon emissions by approximately 900 to 1,200 tons annually, contributing to a greener and more sustainable future.

Challenge

As the consumer manufactures HDPE pipes, the factory operates continuously. Any power failure during installation or operation could result in significant production losses and increased wastage, posing a critical challenge.

Solution

To ensure uninterrupted operations, the project team planned to take only one carefully scheduled shutdown during the grid connectivity process. This minimized disruptions, maintained operational efficiency, and prevented production losses.