Pravin Masalewale Hyderabad

Location:

Hyderabad

Type:

Roof-top metal sheet

Plant Capacity:

600 kWp

Technology Used:

Monocrystalline Modules with
String Inverters

Roof Orientation:

North-South

Performance Metrics:

Annual Power Generation:

821,250 kWh per year

Expected Lifetime Generation (25 years):

20,531,250 kWh over 25 years

Sustainability Impact:

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

Highlights

This project holds a special significance as it was commissioned during the early adoption phase of net metering in India. Completed in 2016, the system has been operating with consistent efficiency and reliability to date, demonstrating the robustness of its design and execution.

Solution

The team meticulously planned the project to ensure all required materials were procured and transported within the stipulated timeframe. Through efficient resource allocation and streamlined execution, the project was completed in a record time of 15 days, from designing to handover to the client.
This rapid execution was achieved without compromising on quality, meeting both the client’s expectations and their operational timeline.

Call Us

+91 88888 35719

+91 70837 33418

info@aaraenergy.com

Call Us

+91 70837 33418

sales@aaraenergy.com

Pravin Masalewale Hyderabad

Location:Hyderabad

Type: Roof-top metal sheet

Plant Capacity: 600 kWp

Technology Used: Monocrystalline Modules with String Inverters

Roof Orientation: North-South

Performance Metrics:

• Annual Power Generation: 821,250 kWh per year
• Expected Lifetime Generation (25 years):20,531,250 kWh over 25 years

Highlight:

This project holds a special significance as it was commissioned during the early adoption phase of net metering in India. Completed in 2016, the system has been operating with consistent efficiency and reliability to date, demonstrating the robustness of its design and execution.

Solution

The team meticulously planned the project to ensure all required materials were procured and transported within the stipulated timeframe. Through efficient resource allocation and streamlined execution, the project was completed in a record time of 15 days, from designing to handover to the client.

This rapid execution was achieved without compromising on quality, meeting both the client’s expectations and their operational timeline.

Call Us

+91 88888 35719

+91 70837 33418

info@aaraenergy.com

Other Projects

Scroll to Top