Advik Hi-Tech Pvt. Ltd.

Location:

Bangalore

Type:

Roof-top metal sheet

Plant Capacity:

99 kWp

Technology Used:

Monocrystalline Modules with
String Inverters

Roof Orientation:

South

Performance Metrics:

Annual Power Generation:

[To be calculated based on irradiance data]

Expected Lifetime Generation (25 years):

[To be calculated based on system efficiency and degradation rates]

Sustainability Impact:

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

This project is expected to reduce carbon
emissions by approximately 900 to 1,
200 tons annually, contributing to a greener
and more sustainable future.

Challenge

The project site was located in a remote area outside Bangalore, where transportation services were not readily available. Ensuring the availability of materials and completing the project within a strict timeline presented a significant challenge.

Solution

The team meticulously planned the project to ensure all required materials were procured and transported within the stipulated timeframe. Through efficient resource allocation and streamlined execution, the project was completed in a record time of 15 days, from designing to handover to the client.
This rapid execution was achieved without compromising on quality, meeting both the client’s expectations and their operational timeline.

Call Us

+91 88888 35719

+91 70837 33418

info@aaraenergy.com

Call Us

+91 70837 33418

sales@aaraenergy.com

Advik Hi-Tech Pvt. Ltd.

Location:Bangalore

Type: Roof-top metal sheet

Plant Capacity: 99 kWp

Technology Used: Monocrystalline Modules with String Inverters

Roof Orientation: South

Performance Metrics:

• Annual Power Generation: [To be calculated based on irradiance data]
• Expected Lifetime Generation (25 years): [To be calculated based on system efficiency and degradation rates]

Challenge

The project site was located in a remote area outside Bangalore, where transportation services were not readily available. Ensuring the availability of materials and completing the project within a strict timeline presented a significant challenge.

Solution

The team meticulously planned the project to ensure all required materials were procured and transported within the stipulated timeframe. Through efficient resource allocation and streamlined execution, the project was completed in a record time of 15 days, from designing to handover to the client.

This rapid execution was achieved without compromising on quality, meeting both the client’s expectations and their operational timeline.